Please, please use “July 9” rather than “7/9”: the latter usually means ‘7 September’ on this side of the Atlantic. (While you’re there, “July 9-15” would be even better.)
The ISO dating standard is generally a good option for avoiding ambiguity. It’s sorted from largest to smallest, e.g. 2012-07-18.
Please, please use “July 9” rather than “7/9”: the latter usually means ‘7 September’ on this side of the Atlantic. (While you’re there, “July 9-15” would be even better.)
The ISO dating standard is generally a good option for avoiding ambiguity. It’s sorted from largest to smallest, e.g. 2012-07-18.