I used to do this conversion when I was contracting at hourly rates and my time was the bottleneck: should I fix the toilet myself or call a plumber? It no longer makes sense on a 9-5 job. The fungibility options (have I used this term right?) are different.
I used to do this conversion when I was contracting at hourly rates and my time was the bottleneck: should I fix the toilet myself or call a plumber? It no longer makes sense on a 9-5 job. The fungibility options (have I used this term right?) are different.